A project plan is as good as long as the assumptions that were the basis of its preparation are confirmed. One of the main hypothesis is the resource availability. Activities duration and at the end, the project duration, is based on the quantity to be performed, the number of assigned resources and their productivity. Unfortunately, all the organizations are characterized by limited resources, so the main hypothesis is false from the very beginning.

CPM Consulting® experts analyze together with our clients the availability of resources, their skills and productivities, establishing the structure of crews to be assigned to activities. We identify the minimum number of required resources considering the technological, organization and contractual constraints. As result, we obtain the optimal schedule at the minimum cost.